In a previous issue of Tyrone PastTimes I wrote what I had found out about the arched flume that contains Dry Run as it passes under Tyrone. I asked that if anyone had more insight into its history to please let me know. I want to thank Scott Troutman for sending me excerpts from old newspapers. If it wasn’t for his eagle eye, this information could have been overlooked.

There are still many unanswered questions but now we do know this: in the June floods of 1889, areas of Tyrone sustained much damage. According to the Tyrone Herald dated December 9, 1889, “The charges against the June flood are closed. Damage to the thirty-eight Pennsylvania Railroad locomotives was over $105,000.” Mr. Troutman indicated that this is the same storm that caused the massive flooding in Johnstown, Pennsylvania.

From what appeared in the Tyrone Herald over the next few months, it seems construction of the arched flume was underway at this time.

Mr. Troutman mentioned in his email to me that in June 1889 there was a very contentious vote over a bond of $10,000 the city wanted to issue “for street repairs and flood control measures,” but this was voted down with the opposition led by Fred Beyer. The failure was largely due to the fact that the city fathers would not specifically say what they were going to do with the money. So, at this point it is not known where the money came from for the flood control construction, only that it did come.

The arches go up

On September 11, 1889, the Tyrone Herald reported that the Highway Department was authorized to receive bids for the cobbling of Main Street arch over Dry Run.

From the October 24, 1889, Tyrone Herald: “With the new arch over Dry Run at Lincoln Avenue, now under way, together with the arch and walls through the properties of F.D. Beyer between Logan and Main Streets, and the cobbling of Main Street arch by the borough authorities, there is good reason to expect that this sometimes turbulent stream will in the future be induced to act with more circumspection, or in other words not to run all over creation and Tyrone Borough in particular.”

On November 15, 1889, a very short entry in the Herald reads, “F.D. Beyer expects to complete his arch over Dry Run today or tomorrow.” Earlier Mr. Beyer was very much against the bond because of unanswered questions and now “his” arch is expected to be completed. Does this mean that as a businessman it was his responsibility to fund the arch through his property? I found the wording very interesting.

On November 19, 1889, there were three references as to the state of affairs in Tyrone:

  • The paper mill was forced to shut down due to “muddy water.”
  • After a series of heavy rains caused the rivers to again rise to flood stage, “the most plentiful article in town at the present time is mud.”
  • “Dry Run has become a little torrent and the newly constructed arches stand a fair chance of an early test.”

The final reference to the arches for the remainder of the year was two days later, “The arch over Dry Run on Lincoln Avenue is nearing completion.”

Does this mean there are still more arches that need to be explored? The only place Dry Run crosses Lincoln Avenue that I know of is at the corner of Lincoln and 15th Streets, and that is a bridge. That bridge is built in arches.

We now have more information as to when the waterway was constructed, but who paid for it? Was it constructed in sections at the property owners’ expense, and if so, by whom? More questions than answers, but we know more now than we did after the article in the last issue of the Tyrone PastTimes. Keep looking and if you find a lead let me know. This is what makes history so much fun.

Share your memories

Leave a reply

Your email is never published. Required fields are marked with an asterisk.